NEC Express5800/GT110d-S Guide d'installation Page 242

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 278
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 241
6. Setting Up Windows Server 2003
Chapter 1 Installing Windows
18. After the system starts,
follow step 1 to start Broadcom Control Suite3 and confirm that a team has
been created. Confirm the team settings on the Information window to the right.
Smart Load Balancing and Failover (without Standby Member)
Smart Load Balancing (Auto-Failback Disable) (with Standby Member)
Team setup is now complete.
Express5800/GT-110d, GT-110d-S, R110d-1E, E110d-1 Installation Guide (Windows)
242
Vue de la page 241
1 2 ... 237 238 239 240 241 242 243 244 245 246 247 ... 277 278

Commentaires sur ces manuels

Pas de commentaire