NEC 2400 ipx Manuel d'utilisateur

Naviguer en ligne ou télécharger Manuel d'utilisateur pour Téléphones NEC 2400 ipx. NEC 2400 ipx User's Manual Manuel d'utilisatio

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 428
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs

Résumé du contenu

Page 1 - NEC Corporation

ND-71548 (E)ISSUE 2Installation ManualAUGUST 2002NEC CorporationTo view the latest issue of this document go to NEC Knowledgebase @ http://www.kbase.c

Page 2

PRODUCT LIABILITY ND-71548 (E)PL- 8Issue 22.2.5 Safety Environment2.2.6 Temperature and Humidity2.2.7 Air Conditioning Facilities2.3 Notice Regarding

Page 3 - BEFORE THE USE OF THIS MANUAL

CHAPTER 3 ND-71548 (E)Page 82Issue 2INSTALLATION PROCEDUREFigure 008-8 Stripped Length of Main and Branch CableNAP-200-008Sheet 11/13Connection of Po

Page 4 - Preserve the following:

ND-71548 (E) CHAPTER 3Page 83Issue 2INSTALLATION PROCEDUREFigure 008-9 Inserting of Cables into TerminalFigure 008-10 Clamping for Branch JointingNA

Page 5

CHAPTER 3 ND-71548 (E)Page 84Issue 2INSTALLATION PROCEDUREFigure 008-11 TapingFigure 008-12 CoveringNAP-200-008Sheet 13/13Connection of Power and Gr

Page 6

ND-71548 (E) CHAPTER 3Page 85Issue 2INSTALLATION PROCEDUREThis NAP explains the following work items:• Extraction of Mounted Circuit Cards• Mounting o

Page 7 - 155 53 13 123

CHAPTER 3 ND-71548 (E)Page 86Issue 2INSTALLATION PROCEDURE2. EXTRACTION OF MOUNTED CIRCUIT CARDSNAP-200-009Sheet 2/13Setting of Switch Positions and M

Page 8

ND-71548 (E) CHAPTER 3Page 87Issue 2INSTALLATION PROCEDUREFigure 009-1 Removal of Card StopperNAP-200-009Sheet 3/13Setting of Switch Positions and Mo

Page 9

CHAPTER 3 ND-71548 (E)Page 88Issue 2INSTALLATION PROCEDURE3. MOUNTING OF CIRCUIT CARDSNAP-200-009Sheet 4/13Setting of Switch Positions and Mounting of

Page 10

ND-71548 (E) CHAPTER 3Page 89Issue 2INSTALLATION PROCEDURE4. SETTING OF SWITCH POSITIONS ON CIRCUIT CARDSNAP-200-009Sheet 5/13Setting of Switch Positi

Page 11

CHAPTER 3 ND-71548 (E)Page 90Issue 2INSTALLATION PROCEDURENAP-200-009Sheet 6/13Setting of Switch Positions and Mounting of Circuit CardsATTENTIONConte

Page 12 - This page is for your notes

ND-71548 (E) CHAPTER 3Page 91Issue 2INSTALLATION PROCEDURE5. INSTALLATION OF CPRThis section explains how to install the CPR into the LPM (MGC). Perfo

Page 13 - Installation Manual

ND-71548 (E) PRODUCT LIABILITY PL- 9Issue 2PRODUCT LIABILITY2.4 Periodic Repair Parts and DisposablesATTENTIONReplace the periodic repair parts such a

Page 14

CHAPTER 3 ND-71548 (E)Page 92Issue 2INSTALLATION PROCEDURESTEP 4: Insert the ISAGT (PZ-GT25/26) card into slot 6 as shown below.Figure 009-6 Insertio

Page 15

ND-71548 (E) CHAPTER 3Page 93Issue 2INSTALLATION PROCEDURESTEP 6: Insert the optional LANI card(s) when FCCS is used via LAN.Note: FCCS stands for Fus

Page 16

CHAPTER 3 ND-71548 (E)Page 94Issue 2INSTALLATION PROCEDURESTEP 8: Attach the Front Panel again by fastening the removed two screws at the lowerside of

Page 17

ND-71548 (E) CHAPTER 3Page 95Issue 2INSTALLATION PROCEDURESTEP 12: Turn ON the MBR key on the DSP of the CPR.Figure 009-12 Turning ON the MBR keySTEP

Page 18

CHAPTER 3 ND-71548 (E)Page 96Issue 2INSTALLATION PROCEDURENote 1:PZ-GT25 is for Single IMG, PZ-GT26 is for Multiple IMG.Note 2: FCCS stands for Fusion

Page 19 - CHAPTER 1 INTRODUCTION

ND-71548 (E) CHAPTER 3Page 97Issue 2INSTALLATION PROCEDUREFigure 009-15 Cable Connection Diagram for CPRNAP-200-009Sheet 13/13Setting of Switch Posit

Page 20 - IP Network

CHAPTER 3 ND-71548 (E)Page 98Issue 2INSTALLATION PROCEDUREThis NAP explains how to run the following internal cables between Modules.NAP-200-010Sheet

Page 21

ND-71548 (E) CHAPTER 3Page 99Issue 2INSTALLATION PROCEDURE Since cable connections vary depending on the system configuration, which includes how many

Page 22 - Installation of the Base Unit

CHAPTER 3 ND-71548 (E)Page 100Issue 2INSTALLATION PROCEDURENAP-200-010Sheet 3/64Internal Cable Connections Table 010-1 Quick Reference Table (Continu

Page 23

ND-71548 (E) CHAPTER 3Page 101Issue 2INSTALLATION PROCEDURENAP-200-010Sheet 4/64Internal Cable Connections Table 010-1 Quick Reference Table (Continu

Page 24

PRODUCT LIABILITY ND-71548 (E)PL- 10Issue 2PRODUCT LIABILITYThis page is for your notes.

Page 25

CHAPTER 3 ND-71548 (E)Page 102Issue 2INSTALLATION PROCEDURE NAP-200-010Sheet 5/64Internal Cable Connections Table 010-1 Quick Reference Table (Contin

Page 26 - CHAPTER 2 INSTALLATION DESIGN

ND-71548 (E) CHAPTER 3Page 103Issue 2INSTALLATION PROCEDURE NAP-200-010Sheet 6/64Internal Cable Connections Table 010-1 Quick Reference Table (Contin

Page 27

CHAPTER 3 ND-71548 (E)Page 104Issue 2INSTALLATION PROCEDURE NAP-200-010Sheet 7/64Internal Cable Connections Table 010-1 Quick Reference Table (Contin

Page 28 - 5.1 Floor Surface

ND-71548 (E) CHAPTER 3Page 105Issue 2INSTALLATION PROCEDUREFigure 010-1 Locations of Connectors on the PIM BackplaneNAP-200-010Sheet 8/64Internal Cab

Page 29

CHAPTER 3 ND-71548 (E)Page 106Issue 2INSTALLATION PROCEDUREFigure 010-2 Locations of Connectors on the LPM (MGC) Backplane (BZ-C24)NAP-200-010Sheet 9

Page 30

ND-71548 (E) CHAPTER 3Page 107Issue 2INSTALLATION PROCEDUREFigure 010-3 Location of Connectors on the TSWM Backplane (Multiple IMG Configuration)NAP-

Page 31

CHAPTER 3 ND-71548 (E)Page 108Issue 2INSTALLATION PROCEDUREFigure 010-4 Locations of Connectors on the Power Distribution Terminal Board (PZ-M371)NAP

Page 32

ND-71548 (E) CHAPTER 3Page 109Issue 2INSTALLATION PROCEDURERun the power cables, referring to Figure 010-6. Then, fasten the cables to the cabinet, re

Page 33 - (8192 time slots)

CHAPTER 3 ND-71548 (E)Page 110Issue 2INSTALLATION PROCEDUREFigure 010-6 Details on Power Cable Connections (for 1-PIM System)NAP-200-010Sheet 13/64In

Page 34

ND-71548 (E) CHAPTER 3Page 111Issue 2INSTALLATION PROCEDURENAP-200-010Sheet 14/64Internal Cable Connections Single IMG ConfigurationTable 010-2 Detai

Page 35 - 48 TS/SW

ND-71548 (E)ISSUE 2AUGUST, 2002NEAX2400 IPXInternet Protocol eXchangeInstallation ManualTABLE OF CONTENTSPageND-71548 (E) TABLE OF CONTENTSPage iIssue

Page 36 - 01 03 04 05 06 07 08

CHAPTER 3 ND-71548 (E)Page 112Issue 2INSTALLATION PROCEDURERun the power cables, referring to Figure 010-8. Then, fasten the cables to the cabinet, re

Page 37 - Multiple IMG

ND-71548 (E) CHAPTER 3Page 113Issue 2INSTALLATION PROCEDUREFigure 010-8 Details on Power Cable Connections (for 2-PIM System)NAP-200-010Sheet 16/64In

Page 38

CHAPTER 3 ND-71548 (E)Page 114Issue 2INSTALLATION PROCEDURENAP-200-010Sheet 17/64Internal Cable Connections Single IMG ConfigurationTable 010-3 Detai

Page 39

ND-71548 (E) CHAPTER 3Page 115Issue 2INSTALLATION PROCEDURERun the power cables, referring to Figure 010-10. Then, fasten the cables to the cabinet, r

Page 40 - LPM (MGC)

CHAPTER 3 ND-71548 (E)Page 116Issue 2INSTALLATION PROCEDUREFigure 010-10 Details on Power Cable Connections (for 3-PIM System)NAP-200-010Sheet 19/64I

Page 41

ND-71548 (E) CHAPTER 3Page 117Issue 2INSTALLATION PROCEDURENAP-200-010Sheet 20/64Internal Cable Connections Single IMG ConfigurationTable 010-4 Detai

Page 42

CHAPTER 3 ND-71548 (E)Page 118Issue 2INSTALLATION PROCEDURERun the power cables, referring to Figure 010-12. Then, fasten the cables to the cabinet, r

Page 43

ND-71548 (E) CHAPTER 3Page 119Issue 2INSTALLATION PROCEDUREFigure 010-12 Details on Power Cable Connections (for 4-PIM System)NAP-200-010Sheet 22/64I

Page 44

CHAPTER 3 ND-71548 (E)Page 120Issue 2INSTALLATION PROCEDURENAP-200-010Sheet 23/64Internal Cable Connections Single IMG ConfigurationTable 010-5 Detai

Page 45

ND-71548 (E) CHAPTER 3Page 121Issue 2INSTALLATION PROCEDURERun the internal power cables, referring to Figure 010-13 through Figure 010-21.Figure 010-

Page 46

TABLE OF CONTENTS ND-71548 (E)Page iiIssue 2TABLE OF CONTENTS (CONTINUED)PageCHAPTER 3 INSTALLATION PROCEDURE . . . . . . . . . . . . . . . . . .

Page 47

CHAPTER 3 ND-71548 (E)Page 122Issue 2INSTALLATION PROCEDURENAP-200-010Sheet 25/64Internal Cable Connections Multiple IMG ConfigurationTable 010-6 Pow

Page 48 - Branch or extend power cable

ND-71548 (E) CHAPTER 3Page 123Issue 2INSTALLATION PROCEDUREFigure 010-14 Power Cable Connections for IMG1 (1-PIM System) (Multiple IMG Configuration

Page 49

CHAPTER 3 ND-71548 (E)Page 124Issue 2INSTALLATION PROCEDURENAP-200-010Sheet 27/64Internal Cable Connections Multiple IMG ConfigurationTable 010-7 Pow

Page 50 - 1M1+I2M2)

ND-71548 (E) CHAPTER 3Page 125Issue 2INSTALLATION PROCEDUREFigure 010-15 Power Cable Connections for IMG1 (2-PIM System) (Multiple IMG Configuration

Page 51

CHAPTER 3 ND-71548 (E)Page 126Issue 2INSTALLATION PROCEDURENAP-200-010Sheet 29/64Internal Cable Connections Multiple IMG ConfigurationTable 010-8 Pow

Page 52

ND-71548 (E) CHAPTER 3Page 127Issue 2INSTALLATION PROCEDUREFigure 010-16 Power Cable Connections for IMG1 (3-PIM System) (Multiple IMG Configuration

Page 53

CHAPTER 3 ND-71548 (E)Page 128Issue 2INSTALLATION PROCEDURENAP-200-010Sheet 31/64Internal Cable Connections Multiple IMG ConfigurationTable 010-9 Pow

Page 54 - 2.1 Outline

ND-71548 (E) CHAPTER 3Page 129Issue 2INSTALLATION PROCEDUREFigure 010-17 Power Cable Connections for IMG1 (4-PIM System) (Multiple IMG Configuration

Page 55

CHAPTER 3 ND-71548 (E)Page 130Issue 2INSTALLATION PROCEDURENAP-200-010Sheet 33/64Internal Cable Connections Multiple IMG ConfigurationTable 010-10 Po

Page 56 - 3. INSTALLATION PROCEDURE

ND-71548 (E) CHAPTER 3Page 131Issue 2INSTALLATION PROCEDUREFigure 010-18 Power Cable Connections for IMG2/3 (1-PIM System) (Multiple IMG Configurati

Page 57 - Installation Preparation

ND-71548 (E) TABLE OF CONTENTSPage iiiIssue 2TABLE OF CONTENTS (CONTINUED)PageNAP-200-015 Cable Termination and Cross Connections from MDF to Periphe

Page 58

CHAPTER 3 ND-71548 (E)Page 132Issue 2INSTALLATION PROCEDURENAP-200-010Sheet 35/64Internal Cable Connections Multiple IMG ConfigurationTable 010-11 Po

Page 59

ND-71548 (E) CHAPTER 3Page 133Issue 2INSTALLATION PROCEDUREFigure 010-19 Power Cable Connections for IMG2/3 (2-PIM System) (Multiple IMG Configurati

Page 60 - NAP-200-002

CHAPTER 3 ND-71548 (E)Page 134Issue 2INSTALLATION PROCEDURENAP-200-010Sheet 37/64Internal Cable Connections Multiple IMG ConfigurationTable 010-12 Po

Page 61

ND-71548 (E) CHAPTER 3Page 135Issue 2INSTALLATION PROCEDUREFigure 010-20 Power Cable Connections for IMG2/3 (3-PIM System) (Multiple IMG Configurati

Page 62

CHAPTER 3 ND-71548 (E)Page 136Issue 2INSTALLATION PROCEDURENAP-200-010Sheet 39/64Internal Cable Connections Multiple IMG ConfigurationTable 010-13 Po

Page 63

ND-71548 (E) CHAPTER 3Page 137Issue 2INSTALLATION PROCEDUREFigure 010-21 Power Cable Connections for IMG2/3 (4-PIM System) (Multiple IMG Configurati

Page 64 - Sheet 6/8

CHAPTER 3 ND-71548 (E)Page 138Issue 2INSTALLATION PROCEDURENAP-200-010Sheet 41/64Internal Cable Connections Multiple IMG ConfigurationTable 010-14 Po

Page 65 - Sheet 7/8

ND-71548 (E) CHAPTER 3Page 139Issue 2INSTALLATION PROCEDURERun the bus cables, referring to Figure 010-23. Then, fasten the bus cables to the cabinet,

Page 66

CHAPTER 3 ND-71548 (E)Page 140Issue 2INSTALLATION PROCEDUREFigure 010-23 Details on Bus Cable Connections (for 1-PIM System) Note: Cable in bracket i

Page 67 - Unpacking and Inspection

ND-71548 (E) CHAPTER 3Page 141Issue 2INSTALLATION PROCEDURERun the bus cables, referring to Figure 010-25. Then, fasten the bus cables to the cabinet,

Page 68

TABLE OF CONTENTS ND-71548 (E)Page ivIssue 2TABLE OF CONTENTS (CONTINUED)PageNAP-200-020 Program Install and Load . . . . . . . . . . . . . . . . .

Page 69 - NAP-200-004

CHAPTER 3 ND-71548 (E)Page 142Issue 2INSTALLATION PROCEDUREFigure 010-25 Details on Bus Cable Connections (for 2-PIM System)NAP-200-010Sheet 45/64Int

Page 70

ND-71548 (E) CHAPTER 3Page 143Issue 2INSTALLATION PROCEDURENote:Cable in bracket is for a dual-system.NAP-200-010Sheet 46/64Internal Cable Connections

Page 71

CHAPTER 3 ND-71548 (E)Page 144Issue 2INSTALLATION PROCEDURERun the bus cables, referring to Figure 010-27. Then, fasten the bus cables to the cabinet,

Page 72 - Mounting of Units and Modules

ND-71548 (E) CHAPTER 3Page 145Issue 2INSTALLATION PROCEDUREFigure 010-27 Details on Bus Cable Connections (for 3-PIM System)NAP-200-010Sheet 48/64Int

Page 73 - Sheet 2/18

CHAPTER 3 ND-71548 (E)Page 146Issue 2INSTALLATION PROCEDURENote:Cable in bracket is for a dual-system.NAP-200-010Sheet 49/64Internal Cable Connections

Page 74 - FAN Mounting Plate

ND-71548 (E) CHAPTER 3Page 147Issue 2INSTALLATION PROCEDURERun the power cables, referring to Figure 010-29. Then, fasten the cables to the cabinet, r

Page 75 - Sheet 4/18

CHAPTER 3 ND-71548 (E)Page 148Issue 2INSTALLATION PROCEDUREFigure 010-29 Details on Bus Cable Connections (for 4-PIM System)NAP-200-010Sheet 51/64Int

Page 76 - Sheet 5/18

ND-71548 (E) CHAPTER 3Page 149Issue 2INSTALLATION PROCEDURENote:Cable in bracket is for a dual-system.NAP-200-010Sheet 52/64Internal Cable Connections

Page 77 - Sheet 6/18

CHAPTER 3 ND-71548 (E)Page 150Issue 2INSTALLATION PROCEDUREFigure 010-30 Internal Bus Cable Connections for IMG0 (Multiple IMG Configuration)NAP-200-

Page 78 - Sheet 7/18

ND-71548 (E) CHAPTER 3Page 151Issue 2INSTALLATION PROCEDURENAP-200-010Sheet 54/64Internal Cable Connections Multiple IMG ConfigurationTable 010-19 I

Page 79 - Sheet 8/18

ND-71548 (E) TABLE OF CONTENTSPage vIssue 2TABLE OF CONTENTS (CONTINUED)Page6.1 Outline . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Page 80 - Sheet 9/18

CHAPTER 3 ND-71548 (E)Page 152Issue 2INSTALLATION PROCEDUREFigure 010-31 Internal Bus Cable Connections for IMG1 (1-PIM System) (Multiple IMG Configu

Page 81 - Sheet 10/18

ND-71548 (E) CHAPTER 3Page 153Issue 2INSTALLATION PROCEDUREFigure 010-32 Internal Bus Cable Connections for IMG1 (2-PIM System) (Multiple IMG Configu

Page 82 - Sheet 11/18

CHAPTER 3 ND-71548 (E)Page 154Issue 2INSTALLATION PROCEDURENAP-200-010Sheet 57/64Internal Cable Connections Multiple IMG ConfigurationTable 010-21 I

Page 83 - Sheet 12/18

ND-71548 (E) CHAPTER 3Page 155Issue 2INSTALLATION PROCEDUREFigure 010-33 Internal Bus Cable Connections for IMG1 (3-PIM System) (Multiple IMG Configu

Page 84 - Sheet 13/18

CHAPTER 3 ND-71548 (E)Page 156Issue 2INSTALLATION PROCEDURENAP-200-010Sheet 59/64Internal Cable Connections Multiple IMG ConfigurationTable 010-22 I

Page 85 - Sheet 14/18

ND-71548 (E) CHAPTER 3Page 157Issue 2INSTALLATION PROCEDUREFigure 010-34 Internal Bus Cable Connections for IMG1 (4-PIM System) (Multiple IMG Configu

Page 86 - Sheet 15/18

CHAPTER 3 ND-71548 (E)Page 158Issue 2INSTALLATION PROCEDURENAP-200-010Sheet 61/64Internal Cable Connections Multiple IMG ConfigurationTable 010-23 I

Page 87

ND-71548 (E) CHAPTER 3Page 159Issue 2INSTALLATION PROCEDUREFiguers 010-35 through 010-37 show the configuration of the internal bus cables for IMG2/3.

Page 88 - NAP-200-006

CHAPTER 3 ND-71548 (E)Page 160Issue 2INSTALLATION PROCEDUREFigure 010-36 Internal Bus Cable Connections for IMG2/3 (3-PIM System) (Multiple IMG Confi

Page 89 - Installation of the MDF

ND-71548 (E) CHAPTER 3Page 161Issue 2INSTALLATION PROCEDUREFigure 010-37 Internal Bus Cable Connections for IMG2/3 (4-PIM System) (Multiple IMG Confi

Page 90

TABLE OF CONTENTS ND-71548 (E)Page viIssue 2This page is for your notes.

Page 91

CHAPTER 3 ND-71548 (E)Page 162Issue 2INSTALLATION PROCEDUREThis NAP explains how to run the frame-to-frame cables for 2/3/4-IMG System.NAP-200-011Shee

Page 92

ND-71548 (E) CHAPTER 3Page 163Issue 2INSTALLATION PROCEDUREFigure 011-1 Inter-Frame ISA Bus Cable Connections for IMG0-IMG1 (Multiple IMG Configurati

Page 93

CHAPTER 3 ND-71548 (E)Page 164Issue 2INSTALLATION PROCEDUREFigure 011-2 Inter-Frame Bus Cable Connections for IMG0-IMG1 (Multiple IMG Configuration)N

Page 94

ND-71548 (E) CHAPTER 3Page 165Issue 2INSTALLATION PROCEDURENAP-200-011Sheet 4/24Inter-Frame Cable Connections Multiple IMG ConfigurationTable 011-2

Page 95

CHAPTER 3 ND-71548 (E)Page 166Issue 2INSTALLATION PROCEDUREFigure 011-3 Inter-Frame Bus Cable Connections for IMG1-IMG2 (1-PIM System)NAP-200-011Shee

Page 96

ND-71548 (E) CHAPTER 3Page 167Issue 2INSTALLATION PROCEDUREFigure 011-4 Inter-Frame Bus Cable Connections for IMG1-IMG2 (2-PIM System)NAP-200-011Shee

Page 97

CHAPTER 3 ND-71548 (E)Page 168Issue 2INSTALLATION PROCEDURENAP-200-011Sheet 7/24Inter-Frame Cable Connections Multiple IMG ConfigurationTable 011-4

Page 98

ND-71548 (E) CHAPTER 3Page 169Issue 2INSTALLATION PROCEDUREFigure 011-5 Inter-Frame Bus Cable Connections for IMG1-IMG2 (3-PIM System)NAP-200-011Shee

Page 99 - 4. BRANCHING OF POWER CABLES

CHAPTER 3 ND-71548 (E)Page 170Issue 2INSTALLATION PROCEDURENAP-200-011Sheet 9/24Inter-Frame Cable Connections Multiple IMG ConfigurationTable 011-5

Page 100 - Sheet 11/13

ND-71548 (E) CHAPTER 3Page 171Issue 2INSTALLATION PROCEDUREFigure 011-6 Inter-Frame Bus Cable Connections for IMG1-IMG2 (4-PIM System)NAP-200-011Shee

Page 101 - Sheet 12/13

ND-71548 (E) CHAPTER 1 Page 1Issue 2INTRODUCTIONCHAPTER 1 INTRODUCTION1. GENERALThe figure below shows the outer view of the NEAX2400 IPX-referred to

Page 102 - Sheet 13/13

CHAPTER 3 ND-71548 (E)Page 172Issue 2INSTALLATION PROCEDURENAP-200-011Sheet 11/24Inter-Frame Cable Connections Multiple IMG ConfigurationTable 011-6

Page 103 - Mounting of Circuit Cards

ND-71548 (E) CHAPTER 3Page 173Issue 2INSTALLATION PROCEDUREFigure 011-7 Inter-Frame Bus Cable Connections for IMG1-IMG3 (1-PIM System)NAP-200-011Shee

Page 104 - Sheet 2/13

CHAPTER 3 ND-71548 (E)Page 174Issue 2INSTALLATION PROCEDUREFigure 011-8 Inter-Frame Bus Cable Connections for IMG1-IMG3 (2-PIM System)NAP-200-011Shee

Page 105 - INSTALLATION PROCEDURE

ND-71548 (E) CHAPTER 3Page 175Issue 2INSTALLATION PROCEDURENAP-200-011Sheet 14/24Inter-Frame Cable Connections Multiple IMG ConfigurationTable 011-8

Page 106 - Sheet 4/13

CHAPTER 3 ND-71548 (E)Page 176Issue 2INSTALLATION PROCEDUREFigure 011-9 Inter-Frame Bus Cable Connections for IMG1-IMG3 (3-PIM System)NAP-200-011Shee

Page 107 - Sheet 5/13

ND-71548 (E) CHAPTER 3Page 177Issue 2INSTALLATION PROCEDURENAP-200-011Sheet 16/24Inter-Frame Cable Connections Multiple IMG ConfigurationTable 011-9

Page 108 - Precautions Required

CHAPTER 3 ND-71548 (E)Page 178Issue 2INSTALLATION PROCEDUREFigure 011-10 Inter-Frame Bus Cable Connections for IMG1-IMG3 (4-PIM System)NAP-200-011She

Page 109 - Sheet 7/13

ND-71548 (E) CHAPTER 3Page 179Issue 2INSTALLATION PROCEDURENAP-200-011Sheet 18/24Inter-Frame Cable Connections Multiple IMG ConfigurationTable 011-10

Page 110 - Sheet 8/13

CHAPTER 3 ND-71548 (E)Page 180Issue 2INSTALLATION PROCEDUREFigure 011-11 Inter-Frame Alarm Bus Cable Connections for IMG0-IMG1NAP-200-011Sheet 19/24I

Page 111 - Sheet 9/13

ND-71548 (E) CHAPTER 3Page 181Issue 2INSTALLATION PROCEDURENAP-200-011Sheet 20/24Inter-Frame Cable Connections Multiple IMG ConfigurationTable 011-11

Page 112 - Sheet 10/13

LIABILITY DISCLAIMERNEC Corporation reserves the right to change the specifications,functions, or features, at any time, without notice.NEC Corporatio

Page 113

CHAPTER 1 ND-71548 (E)Page 2Issue 2INTRODUCTIONThe figure below shows an example of the system configuration of NEAX2400 IPX. PHA : Handles control si

Page 114

CHAPTER 3 ND-71548 (E)Page 182Issue 2INSTALLATION PROCEDURE Figure 011-12 Inter-Frame Alarm Bus Cable Connections for IMG0-IMG2NAP-200-011Sheet 21/24

Page 115

ND-71548 (E) CHAPTER 3Page 183Issue 2INSTALLATION PROCEDURE NAP-200-011Sheet 22/24Inter-Frame Cable Connections Multiple IMG ConfigurationTable 011-1

Page 116 - Internal Cable Connections

CHAPTER 3 ND-71548 (E)Page 184Issue 2INSTALLATION PROCEDUREFigure 011-13 Inter-Frame Alarm Bus Cable Connections for IMG0-IMG3NAP-200-011Sheet 23/24I

Page 117 - Sheet 2/64

ND-71548 (E) CHAPTER 3Page 185Issue 2INSTALLATION PROCEDURENAP-200-011Sheet 24/24Inter-Frame Cable Connections Multiple IMG ConfigurationTable 011-13

Page 118 - Sheet 3/64

CHAPTER 3 ND-71548 (E)Page 186Issue 2INSTALLATION PROCEDURE This NAP describes front cable connections between circuit cards.Note: Protection again

Page 119 - Sheet 4/64

ND-71548 (E) CHAPTER 3Page 187Issue 2INSTALLATION PROCEDUREThis NAP explains the following work items:• Cable Running from the PBX to the MDF and ATTC

Page 120 - Sheet 5/64

CHAPTER 3 ND-71548 (E)Page 188Issue 2INSTALLATION PROCEDURE1. CABLE RUNNING FROM THE PBX TO THE MDF AND ATTCONNAP-200-013Sheet 2/13Cable Running from

Page 121 - Sheet 6/64

ND-71548 (E) CHAPTER 3Page 189Issue 2INSTALLATION PROCEDURENAP-200-013Sheet 3/13Cable Running from the PBX to MDF, ATTCON, MAT, and SMDRCables for ODT

Page 122 - Sheet 7/64

CHAPTER 3 ND-71548 (E)Page 190Issue 2INSTALLATION PROCEDUREFigure 013-1 LT Cable RoutingNAP-200-013Sheet 4/13Cable Running from the PBX to MDF, ATTCO

Page 123 - Page 105

ND-71548 (E) CHAPTER 3Page 191Issue 2INSTALLATION PROCEDURE Figure 013-2 Cable Routing of Circuit Card Front CableNAP-200-013Sheet 5/13Cable Running

Page 124 - Sheet 9/64

ND-71548 (E) CHAPTER 1 Page 3Issue 2INTRODUCTION2. HOW TO FOLLOW THE MANUAL2.1 OutlineThe requiring work is divided into the following chapters. Basic

Page 125 - Sheet 10/64

CHAPTER 3 ND-71548 (E)Page 192Issue 2INSTALLATION PROCEDURE2. CABLE RUNNING FROM THE PBX TO THE MAT AND SMDRNAP-200-013Sheet 6/13Cable Running from th

Page 126 - Page 108

ND-71548 (E) CHAPTER 3Page 193Issue 2INSTALLATION PROCEDURE 3. CONNECTIONS AT THE PBX SIDE4. CABLE TYING AT THE PBXNAP-200-013Sheet 7/13Cable Running

Page 127 - REAR FRONT

CHAPTER 3 ND-71548 (E)Page 194Issue 2INSTALLATION PROCEDURE Figure 013-3 Example of Cable Tying Using Tie-WrapNAP-200-013Sheet 8/13Cable Running fro

Page 128 - REAR VIEW

ND-71548 (E) CHAPTER 3Page 195Issue 2INSTALLATION PROCEDURE5. TERMINATION OF THE CABLES BETWEEN THE PBX AND THE MDF OR ATTCON ONTO THE CABLESUPPORT AS

Page 129 - Sheet 14/64

CHAPTER 3 ND-71548 (E)Page 196Issue 2INSTALLATION PROCEDUREFigure 013-4 Cable Support AssemblyNAP-200-013Sheet 10/13Cable Running from the PBX to MDF

Page 130

ND-71548 (E) CHAPTER 3Page 197Issue 2INSTALLATION PROCEDURENAP-200-013Sheet 11/13Cable Running from the PBX to MDF, ATTCON, MAT, and SMDRTable 013-1

Page 131

CHAPTER 3 ND-71548 (E)Page 198Issue 2INSTALLATION PROCEDUREFigure 013-5 Clamp WindingNAP-200-013Sheet 12/13Cable Running from the PBX to MDF, ATTCON,

Page 132

ND-71548 (E) CHAPTER 3Page 199Issue 2INSTALLATION PROCEDUREFigure 013-6 Termination of Installation CablesNAP-200-013Sheet 13/13Cable Running from th

Page 133

CHAPTER 3 ND-71548 (E)Page 200Issue 2INSTALLATION PROCEDURE This NAP explains the procedures for terminating cables at the MDF.CAUTION: When terminati

Page 134 - Sheet 19/64

ND-71548 (E) CHAPTER 3Page 201Issue 2INSTALLATION PROCEDUREThis NAP explains the following work items:NAP-200-015Sheet 1/32Cable Termination and Cross

Page 135 - Sheet 20/64

CHAPTER 1 ND-71548 (E)Page 4Issue 2INTRODUCTIONFigure 1-3 Example of NAPNAP- 200-004Sheet 3/3Installation of the Base Unit1. INSTALLING THE BASE UNI

Page 136

CHAPTER 3 ND-71548 (E)Page 202Issue 2INSTALLATION PROCEDURE 1. CROSS CONNECTION OF STATIONSNote 1:Provide the necessary cross connections at the MDF b

Page 137 - Sheet 22/64

ND-71548 (E) CHAPTER 3Page 203Issue 2INSTALLATION PROCEDURE2. CROSS CONNECTION OF TRUNKS (C.O. LINES AND TIE LINES)Note 1:Provide the necessary cross

Page 138 - Sheet 23/64

CHAPTER 3 ND-71548 (E)Page 204Issue 2INSTALLATION PROCEDURE Figure 015-2 Cross Connection of Trunks (C.O. Lines and Tie Lines)NAP-200-015Sheet 4/32Ca

Page 139 - Sheet 24/64

ND-71548 (E) CHAPTER 3Page 205Issue 2INSTALLATION PROCEDURE3. CROSS CONNECTIONS FOR PFTNote 1:The COT must be accommodated in a universal slot of the

Page 140 - Sheet 25/64

CHAPTER 3 ND-71548 (E)Page 206Issue 2INSTALLATION PROCEDURENAP-200-015Sheet 6/32Cable Termination and Cross Connections from MDF to Peripheral Equipme

Page 141

ND-71548 (E) CHAPTER 3Page 207Issue 2INSTALLATION PROCEDUREFigure 015-4 Cross Connection for PFTNAP-200-015Sheet 7/32Cable Termination and Cross Conn

Page 142 - Sheet 27/64

CHAPTER 3 ND-71548 (E)Page 208Issue 2INSTALLATION PROCEDURE4. CROSS CONNECTION OF ALARM INDICATING PANEL AND MUSIC ON HOLDNote:Provide the necessary c

Page 143

ND-71548 (E) CHAPTER 3Page 209Issue 2INSTALLATION PROCEDURE Figure 015-5 IPX EXALM CA-A Cabling DiagramNAP-200-015Sheet 9/32Cable Termination and Cro

Page 144 - Sheet 29/64

CHAPTER 3 ND-71548 (E)Page 210Issue 2INSTALLATION PROCEDURE Figure 015-6 Connection of Alarm Indicating Panel and Music on Hold (Single IMG Configu

Page 145 - Sheet 30/64

ND-71548 (E) CHAPTER 3Page 211Issue 2INSTALLATION PROCEDURE Figure 015-7 Connection of Alarm Indicating Panel (Multiple IMG Configuration)Figure 015

Page 146 - Sheet 31/64

ND-71548 (E) CHAPTER 1 Page 5Issue 2INTRODUCTION2.3 How To Follow TreesThis manual explains performance of a predetermined procedure (work contents co

Page 147 - Sheet 32/64

CHAPTER 3 ND-71548 (E)Page 212Issue 2INSTALLATION PROCEDURE<Cable Specification>Figure 015-9 IPX EXALM CA-A CableNAP-200-015Sheet 12/32Cable Te

Page 148 - Sheet 33/64

ND-71548 (E) CHAPTER 3Page 213Issue 2INSTALLATION PROCEDURE5. CROSS CONNECTIONS FOR TAS INDICATORNote:Provide the necessary cross connections at the M

Page 149

CHAPTER 3 ND-71548 (E)Page 214Issue 2INSTALLATION PROCEDURE Figure 015-10 Cable Connection Diagram for TASNAP-200-015Sheet 14/32Cable Termination an

Page 150 - Sheet 35/64

ND-71548 (E) CHAPTER 3Page 215Issue 2INSTALLATION PROCEDURE• Cable Connection DiagramProvide the following connections at the MDF.Figure 015-10 Cable

Page 151 - FRONT VIEWREAR VIEW

CHAPTER 3 ND-71548 (E)Page 216Issue 2INSTALLATION PROCEDURE6. CROSS CONNECTIONS FOR EXTERNAL SWITCHESNote:Provide the necessary cross connections at t

Page 152 - Sheet 37/64

ND-71548 (E) CHAPTER 3Page 217Issue 2INSTALLATION PROCEDURE Figure 015-12 Connection of External SwitchesNAP-200-015Sheet 17/32Cable Termination an

Page 153

CHAPTER 3 ND-71548 (E)Page 218Issue 2INSTALLATION PROCEDURE 7. CONNECTION OF ANNOUNCEMENT MACHINENote:Provide the necessary cross connections at the

Page 154 - Sheet 39/64

ND-71548 (E) CHAPTER 3Page 219Issue 2INSTALLATION PROCEDURE Figure 015-13 Connection of Announcement MachineNAP-200-015Sheet 19/32Cable Termination

Page 155 - Sheet 40/64

CHAPTER 3 ND-71548 (E)Page 220Issue 2INSTALLATION PROCEDURE 8. CONNECTION OF PAGING EQUIPMENTNote:Provide the necessary cross connections at the MDF b

Page 156 - Sheet 41/64

ND-71548 (E) CHAPTER 3Page 221Issue 2INSTALLATION PROCEDURE Figure 015-14 Connection of Paging EquipmentNAP-200-015Sheet 21/32Cable Termination and

Page 157

CHAPTER 1 ND-71548 (E)Page 6Issue 2INTRODUCTIONFigure 1-5 Static Caution IndicationThis manual provides “Static Caution” indicators (see Figure 1-5)

Page 158 - Sheet 43/64

CHAPTER 3 ND-71548 (E)Page 222Issue 2INSTALLATION PROCEDURE9. CROSS CONNECTIONS9.1 When Using Dterm Series E/Dterm 75Note 1:Available distance between

Page 159

ND-71548 (E) CHAPTER 3Page 223Issue 2INSTALLATION PROCEDURE Figure 015-16 Cable Connection for Dterm Series E/Dterm 75NAP-200-015Sheet 23/32Cable

Page 160

CHAPTER 3 ND-71548 (E)Page 224Issue 2INSTALLATION PROCEDURE9.2 When using IP Terminals (IP Enabled Dtermand DtermIP INASET)Figure 015-17 Rear Connect

Page 161 - Sheet 46/64

ND-71548 (E) CHAPTER 3Page 225Issue 2INSTALLATION PROCEDUREFigure 015-18 Connecting IP Terminals to Network9.3 When using Dterm SP20Dterm SP20 is a s

Page 162

CHAPTER 3 ND-71548 (E)Page 226Issue 2INSTALLATION PROCEDURE10. CROSS CONNECTIONS FOR DIGITAL INTERFACESPerform the cross connections for digital inter

Page 163

ND-71548 (E) CHAPTER 3Page 227Issue 2INSTALLATION PROCEDURE Figure 015-20 PLO Pin Assignments for Receiving Clock (Single IMG Configuration)NAP-200-

Page 164 - Sheet 49/64

CHAPTER 3 ND-71548 (E)Page 228Issue 2INSTALLATION PROCEDURE Figure 015-21 PLO Pin Assignments for Receiving Clock (Multiple IMG Configuration)NAP-2

Page 165

ND-71548 (E) CHAPTER 3Page 229Issue 2INSTALLATION PROCEDURE Figure 015-22 Cable Connection Diagram for Accepting Synchronization Clocks from an Ext

Page 166 - Sheet 51/64

CHAPTER 3 ND-71548 (E)Page 230Issue 2INSTALLATION PROCEDURE Figure 015-23 Cable Connection Diagram for Accepting Synchronization Clocks from an Exte

Page 167 - Sheet 52/64

ND-71548 (E) CHAPTER 3Page 231Issue 2INSTALLATION PROCEDURE Figure 015-24 Cable Connection Diagram for Distributing Clock from a Digital Interface

Page 168 - Sheet 53/64

ND-71548 (E) CHAPTER 1 Page 7Issue 2INTRODUCTION2.4 Figure and Table NumbersEach Figure and Table within this manual are numbered as shown below.1. Fi

Page 169 - Sheet 54/64

CHAPTER 3 ND-71548 (E)Page 232Issue 2INSTALLATION PROCEDURE Figure 015-25 Cable Connection Diagram for Distributing Clock from a Digital Interface (

Page 170 - Sheet 55/64

ND-71548 (E) CHAPTER 3Page 233Issue 2INSTALLATION PROCEDUREThis NAP explains the installation of the DESK CONSOLE and Cable Connection. Figure 016-1 s

Page 171 - Sheet 56/64

CHAPTER 3 ND-71548 (E)Page 234Issue 2INSTALLATION PROCEDURE Figure 016-2 Cable Connection Diagram for Desk ConsoleNAP-200-016Sheet 2/44Installatio

Page 172 - Sheet 57/64

ND-71548 (E) CHAPTER 3Page 235Issue 2INSTALLATION PROCEDUREFigure 016-2 Cable Connection Diagram for Desk Console (Continued)NAP-200-016Sheet 3/44Ins

Page 173 - Sheet 58/64

CHAPTER 3 ND-71548 (E)Page 236Issue 2INSTALLATION PROCEDURENote:When replacing Attendant Console with DESK CONSOLE, follow the procedure below:1 Turn

Page 174 - Sheet 59/64

ND-71548 (E) CHAPTER 3Page 237Issue 2INSTALLATION PROCEDURE1. CABLE CONNECTION DIAGRAM(a) When the power is supplied from the PBXFigure 016-3 Cable C

Page 175 - Sheet 60/64

CHAPTER 3 ND-71548 (E)Page 238Issue 2INSTALLATION PROCEDURE2. CALCULATION OF THE DISTANCE BETWEEN THE ATI CIRCUIT CARD AND MODULAR ROSETTEThe distance

Page 176 - Sheet 61/64

ND-71548 (E) CHAPTER 3Page 239Issue 2INSTALLATION PROCEDURE(b) When using Local Power Supply NoteNote:When using local power supply, DESK CONSOLE cann

Page 177

CHAPTER 3 ND-71548 (E)Page 240Issue 2INSTALLATION PROCEDUREFigure 016-5 Cable Connection Diagram for DESK CONSOLE Modular BlockNAP-200-016Sheet 8/44I

Page 178

ND-71548 (E) CHAPTER 3Page 241Issue 2INSTALLATION PROCEDURE3. MOUNTING OF HEADSET (OPTIONAL)The Headset cable connects to one of the modular jacks (HA

Page 179 - Page 161

CHAPTER 2 ND-71548 (E)Page 8Issue 2INSTALLATION DESIGNCHAPTER 2 INSTALLATION DESIGN1. GENERALThis chapter provides information pertaining to installat

Page 180 - Sheet 1/24

CHAPTER 3 ND-71548 (E)Page 242Issue 2INSTALLATION PROCEDURE4. MOUNTING OF HANDSET (OPTIONAL)The Handset cable connects to the modular jack (HAND H/S 0

Page 181 - Sheet 2/24

ND-71548 (E) CHAPTER 3Page 243Issue 2INSTALLATION PROCEDUREFigure 016-7 Mounting of Handset (Left Side of DESK CONSOLE) (Continued)NAP-200-016Sheet 1

Page 182 - Page 164

CHAPTER 3 ND-71548 (E)Page 244Issue 2INSTALLATION PROCEDUREFigure 016-7 Mounting of Handset (Left Side of DESK CONSOLE) (Continued)NAP-200-016Sheet 1

Page 183 - Sheet 4/24

ND-71548 (E) CHAPTER 3Page 245Issue 2INSTALLATION PROCEDURE(b) When mounting at the right side of DESK CONSOLEFigure 016-8 Mounting of Handset (Right

Page 184 - Sheet 5/24

CHAPTER 3 ND-71548 (E)Page 246Issue 2INSTALLATION PROCEDUREFigure 016-8 Mounting of Handset (Right Side of DESK CONSOLE) (Continued)NAP-200-016Sheet

Page 185 - Sheet 6/24

ND-71548 (E) CHAPTER 3Page 247Issue 2INSTALLATION PROCEDUREFigure 016-8 Mounting of Handset (Right Side of DESK CONSOLE) (Continued)NAP-200-016Sheet

Page 186 - Sheet 7/24

CHAPTER 3 ND-71548 (E)Page 248Issue 2INSTALLATION PROCEDURE5. CONNECTION OF RECORDING EQUIPMENTThe following are required for using recording function

Page 187 - Sheet 8/24

ND-71548 (E) CHAPTER 3Page 249Issue 2INSTALLATION PROCEDURE(a) When using three DESK CONSOLEs and one recorder Note 1Note 1:Switch settings of SW10, S

Page 188 - Sheet 9/24

CHAPTER 3 ND-71548 (E)Page 250Issue 2INSTALLATION PROCEDURE(b) When using six DESK CONSOLEs and one recording equipment Note 1Note 1:Switch settings o

Page 189 - Sheet 10/24

ND-71548 (E) CHAPTER 3Page 251Issue 2INSTALLATION PROCEDURE6. 8-CORE LINE CABLE (INSTALLATION CABLE)Figure 016-12 8-core Line CableNAP-200-016Sheet 1

Page 190 - Sheet 11/24

ND-71548 (E) CHAPTER 2Page 9Issue 2INSTALLATION DESIGNNote:A short period means a period not exceeding three consecutive days (72 hours) or 15 days (3

Page 191 - Sheet 12/24

CHAPTER 3 ND-71548 (E)Page 252Issue 2INSTALLATION PROCEDURE7. CONNECTION OF AC-DC ADAPTER (OPTIONAL)The AC-DC adapter is required when the power suppl

Page 192 - Sheet 13/24

ND-71548 (E) CHAPTER 3Page 253Issue 2INSTALLATION PROCEDURE8. MOUNTING OF ADD-ON CONSOLE (FOR HOTEL SYSTEM)ADD-ON CONSOLE is used in the Hotel System.

Page 193 - Sheet 14/24

CHAPTER 3 ND-71548 (E)Page 254Issue 2INSTALLATION PROCEDURE(b) Cable Connection Diagram of Add-On Console (When using Local Power Supply) NoteNote:Whe

Page 194 - Sheet 15/24

ND-71548 (E) CHAPTER 3Page 255Issue 2INSTALLATION PROCEDUREFigure 016-16 Cable Connection Diagram for Add-On Console Modular BlockNAP-200-016Sheet 23

Page 195 - Sheet 16/24

CHAPTER 3 ND-71548 (E)Page 256Issue 2INSTALLATION PROCEDURE9. MOUNTING OF ADD-ON CONSOLE(a) When mounting at the right side of DESK CONSOLEFigure 016-

Page 196 - Sheet 17/24

ND-71548 (E) CHAPTER 3Page 257Issue 2INSTALLATION PROCEDUREFigure 016-17 Mounting of Add-On Console (Right Side of DESK CONSOLE) (Continued)NAP-200-0

Page 197 - Sheet 18/24

CHAPTER 3 ND-71548 (E)Page 258Issue 2INSTALLATION PROCEDURE(b) When mounting at the left side of DESK CONSOLEFigure 016-18 Mounting of Add-On Console

Page 198 - Sheet 19/24

ND-71548 (E) CHAPTER 3Page 259Issue 2INSTALLATION PROCEDUREFigure 016-18 Mounting of Add-On Console (Left Side of DESK CONSOLE) (Continued)NAP-200-01

Page 199 - Sheet 20/24

CHAPTER 3 ND-71548 (E)Page 260Issue 2INSTALLATION PROCEDURE10. CONNECTION OF AC-DC ADAPTER FOR ADD-ON CONSOLE (OPTIONAL)The AC-DC adapter is required

Page 200 - Sheet 21/24

ND-71548 (E) CHAPTER 3Page 261Issue 2INSTALLATION PROCEDURE11. CONFIGURATION MENU11.1 GeneralConfiguration Menu is used for assigning configuration da

Page 201 - Sheet 22/24

CHAPTER 2 ND-71548 (E)Page 10Issue 2INSTALLATION DESIGN3. FLOOR SPACE1. The PBX requires floor space for the following system equipment:• Switching Eq

Page 202 - Sheet 23/24

CHAPTER 3 ND-71548 (E)Page 262Issue 2INSTALLATION PROCEDURE(a) Turn on the Position Busy lamp.When the Position Busy lamp is off, press the Position B

Page 203 - Sheet 24/24

ND-71548 (E) CHAPTER 3Page 263Issue 2INSTALLATION PROCEDUREThe first page of Configuration Menu appears on the LCD. Configuration Menu has a total of

Page 204 - Sheet 1/1

CHAPTER 3 ND-71548 (E)Page 264Issue 2INSTALLATION PROCEDURE12. SELECTION OF CONFIGURATION ITEMBy using a numeric key, press the desired number in Conf

Page 205 - ATTCON, MAT, and SMDR

ND-71548 (E) CHAPTER 3Page 265Issue 2INSTALLATION PROCEDURE13. ASSIGNMENT OF CONFIGURATION DATAThis section explains how to assign each configuration

Page 206

CHAPTER 3 ND-71548 (E)Page 266Issue 2INSTALLATION PROCEDURE14. HEADSET/HANDSETThis item specifies an optional device connected to the HAND H/S0 connec

Page 207 - Sheet 3/13

ND-71548 (E) CHAPTER 3Page 267Issue 2INSTALLATION PROCEDURE15. HEADSET TYPEThis item specifies the type of Headset connected to the H/S1 connector.(a)

Page 208 - Page 190

CHAPTER 3 ND-71548 (E)Page 268Issue 2INSTALLATION PROCEDURE16. MUTEThis item specifies On/Off setting of the mute function for the HAND H/S0 or H/S1 c

Page 209 - Page 191

ND-71548 (E) CHAPTER 3Page 269Issue 2INSTALLATION PROCEDURE17. REC CONTROLThis item specifies the operation mode of a recording device. The following

Page 210 - Sheet 6/13

CHAPTER 3 ND-71548 (E)Page 270Issue 2INSTALLATION PROCEDURE18. SUP CONNECTIONThis item specifies whether the supervisory console is connected or not.(

Page 211

ND-71548 (E) CHAPTER 3Page 271Issue 2INSTALLATION PROCEDURE19. REC VOLUME ADJUSTMENTThis item specifies the recording level of the received voice from

Page 212 - Page 194

ND-71548 (E) CHAPTER 2Page 11Issue 2INSTALLATION DESIGN5.2 WallSwitching Equipment Room• A concrete wall is necessary so that cable racks can be insta

Page 213

CHAPTER 3 ND-71548 (E)Page 272Issue 2INSTALLATION PROCEDURE20. BLFThis item specifies On/Off setting of the BLF function. When using BLF function, sys

Page 214 - Page 196

ND-71548 (E) CHAPTER 3Page 273Issue 2INSTALLATION PROCEDURE21. HOLD/START/RELEASE/SWAPThis item specifies the locations of HOLD, START and RELEASE key

Page 215

CHAPTER 3 ND-71548 (E)Page 274Issue 2INSTALLATION PROCEDURE22. 2ND RINGINGThis item specifies on/off setting of the 2nd ringing.(a) Press the desired

Page 216 - Figure 013-5 Clamp Winding

ND-71548 (E) CHAPTER 3Page 275Issue 2INSTALLATION PROCEDURE23. RINGINGThis item specifies on/off setting of ringing.(a) Press the desired number. An a

Page 217 - Page 199

CHAPTER 3 ND-71548 (E)Page 276Issue 2INSTALLATION PROCEDURE24. UPDATING CONFIGURATION DATAAfter assigning the configuration data, take the next step a

Page 218 - Accommodation of Each Cable)

ND-71548 (E) CHAPTER 3Page 277Issue 2INSTALLATION PROCEDURE This NAP explains the installation of Maintenance Administration Terminal (MAT) and Syste

Page 219 - Page 201

CHAPTER 3 ND-71548 (E)Page 278Issue 2INSTALLATION PROCEDURE Figure 017-1 Cabling of MAT when Using EthernetNAP-200-017Sheet 2/10Installation of the

Page 220 - Cable Termination and Cross

ND-71548 (E) CHAPTER 3Page 279Issue 2INSTALLATION PROCEDURE Figure 017-2 Cable Connection Diagram for the MAT when Using RS-232CNAP-200-017Sheet 3/10

Page 221 - Sheet 3/32

CHAPTER 3 ND-71548 (E)Page 280Issue 2INSTALLATION PROCEDURE 2. INSTALLATION OF MAT AND CABLE CONNECTION BY USING MODEMNote:When the distance between P

Page 222 - Sheet 4/32

ND-71548 (E) CHAPTER 3Page 281Issue 2INSTALLATION PROCEDURE Figure 017-3 Cabling of MAT Using ModemsNAP-200-017Sheet 5/10Installation of the Maintena

Page 223 - PFT (PA-M53)

ND-71548 (E) PRODUCT LIABILITY PL- 1Issue 2PRODUCT LIABILITYBEFORE THE USE OF THIS MANUAL1. FOR SAFETY USEHere explains the safety use for the custome

Page 224 - Sheet 6/32

CHAPTER 2 ND-71548 (E)Page 12Issue 2INSTALLATION DESIGNNote 1:When the rectifier is in the equalize state (charging the batteries), the output DC volt

Page 225 - Page 207

CHAPTER 3 ND-71548 (E)Page 282Issue 2INSTALLATION PROCEDURE 3. INSTALLATION OF SYSTEM MESSAGE PRINTER AND CABLE CONNECTIONSFigure 017-4 Connection

Page 226 - Sheet 8/32

ND-71548 (E) CHAPTER 3Page 283Issue 2INSTALLATION PROCEDUREFigure 017-5 IPX 2PORT CA-A CableNAP-200-017Sheet 7/10Installation of the Maintenance Admi

Page 227 - RPT Terminal (PZ-M377)

CHAPTER 3 ND-71548 (E)Page 284Issue 2INSTALLATION PROCEDUREFigure 017-6 Detail of RS-232C CA-(0)NAP-200-017Sheet 8/10Installation of the Maintenance

Page 228 - Sheet 10/32

ND-71548 (E) CHAPTER 3Page 285Issue 2INSTALLATION PROCEDUREFigure 017-7 Detail of RS-232C CA-(1)NAP-200-017Sheet 9/10Installation of the Maintenance

Page 229 - FM1 is not used

CHAPTER 3 ND-71548 (E)Page 286Issue 2INSTALLATION PROCEDUREFigure 017-8 Detail of RS-232C CA-(3)NAP-200-017Sheet 10/10Installation of the Maintenance

Page 230 - Sheet 12/32

ND-71548 (E) CHAPTER 3Page 287Issue 2INSTALLATION PROCEDURE This NAP explains the cable connection of SMDR equipment.Note: The SMDR RS-232C interface

Page 231 - Sheet 13/32

CHAPTER 3 ND-71548 (E)Page 288Issue 2INSTALLATION PROCEDURE Figure 018-1 Cabling of SMDR when Using EthernetNAP-200-018Sheet 2/4Connections of SMDRA

Page 232 - and/or 23

ND-71548 (E) CHAPTER 3Page 289Issue 2INSTALLATION PROCEDURE Figure 018-2 Cable Connection Diagram for the SMDR when Using RS-232CNAP-200-018Sheet

Page 233 - • Cable Connection Diagram

CHAPTER 3 ND-71548 (E)Page 290Issue 2INSTALLATION PROCEDURE Figure 018-3 Connection of SMDR by Using MODEMNAP-200-018Sheet 4/4Connections of SMDRAT

Page 234 - Sheet 16/32

ND-71548 (E) CHAPTER 4Page 291Issue 2SYSTEM STARTUPCHAPTER 4 SYSTEM STARTUP1. GENERALThis Chapter describes the initial startup procedure and the diag

Page 235 - Page 217

ND-71548 (E) CHAPTER 2Page 13Issue 2INSTALLATION DESIGN6.3 Power Distribution Box RequirementsThe Power Distribution Box (PDB) should be installed wit

Page 236 - Sheet 18/32

CHAPTER 4 ND-71548 (E)Page 292Issue 2SYSTEM STARTUP8. If any portion of the Office Data (especially data related to ringing patterns) has been changed

Page 237

ND-71548 (E) CHAPTER 4Page 293Issue 2SYSTEM STARTUPFigure 4-1 How to handle Circuit CardsATTENTIONContentsStatic SensitiveHandlingPrecautions Requir

Page 238 - Sheet 20/32

CHAPTER 4 ND-71548 (E)Page 294Issue 2SYSTEM STARTUP• When placing a circuit card on a table or other flat surface, spread out a conductive sheet and s

Page 239

ND-71548 (E) CHAPTER 4Page 295Issue 2SYSTEM STARTUP NAP-200-019Sheet 1/2Power ONSTARTVisual Inspection Check whether any pins on the backplane of ea

Page 240 - Sheet 22/32

CHAPTER 4 ND-71548 (E)Page 296Issue 2SYSTEM STARTUP NAP-200-019Sheet 2/2Power ONInsert all PWR Supplies Insert all PWR Supplies into their positions.I

Page 241 - Sheet 23/32

ND-71548 (E) CHAPTER 4Page 297Issue 2SYSTEM STARTUPPerform the following items for loading the program from the flash card.Figure 020-1 Locations of

Page 242 - Rear View

CHAPTER 4 ND-71548 (E)Page 298Issue 2SYSTEM STARTUPNAP-200-020Sheet 2/7Program Install and LoadSTARTFlash Card Insertion Here describes the procedure

Page 243 - SP20 to LAN

ND-71548 (E) CHAPTER 4Page 299Issue 2SYSTEM STARTUPNAP-200-020Sheet 3/7Program Install and LoadSoftware Writing Here describes the procedure for writi

Page 244 - Sheet 26/32

CHAPTER 4 ND-71548 (E)Page 300Issue 2SYSTEM STARTUPNAP-200-020Sheet 4/7Program Install and LoadERROR MESSAGE LISTATTENTIONContentsStatic SensitiveHand

Page 245 - Page 227

ND-71548 (E) CHAPTER 4Page 301Issue 2SYSTEM STARTUPNAP-200-020Sheet 5/7Program Install and LoadPrepare the flash card containing the program.Make sure

Page 246 - Page 228

CHAPTER 2 ND-71548 (E)Page 14Issue 2INSTALLATION DESIGN8. INSTALLATION TOOLSTable 2-2 shows the tools used in a typical NEAX2400 IPX installation.Note

Page 247

CHAPTER 4 ND-71548 (E)Page 302Issue 2SYSTEM STARTUPNAP-200-020Sheet 6/7Program Install and Load Turn ON the PBX as follows. (Note)Loading starts. (&qu

Page 248

ND-71548 (E) CHAPTER 4Page 303Issue 2SYSTEM STARTUPNAP-200-021Sheet 1/2Assignment of Office DataSTARTStart up the MATEnter basic data Assign the follo

Page 249 - Sheet 31/32

CHAPTER 4 ND-71548 (E)Page 304Issue 2SYSTEM STARTUPNAP-200-021Sheet 2/2Assignment of Office DataSave Office Data onto Flash Card Save the Office Data

Page 250 - Sheet 32/32

ND-71548 (E) CHAPTER 4Page 305Issue 2SYSTEM STARTUPNAP-200-022Sheet 1/5Check of Lamp Indications and System MessagesSTARTCheck lamp indications on Lin

Page 251 - Cable Connection

CHAPTER 4 ND-71548 (E)Page 306Issue 2SYSTEM STARTUPFigure 022-1 LED Indications in Normal Operation (Single IMG Configuration)NAP-200-022Sheet 2/5Che

Page 252 - Sheet 2/44

ND-71548 (E) CHAPTER 4Page 307Issue 2SYSTEM STARTUPFigure 022-2 LED Indications of IMG0 in Normal Operation (Multiple IMG Configuration)NAP-200-022Sh

Page 253

CHAPTER 4 ND-71548 (E)Page 308Issue 2SYSTEM STARTUPFigure 022-3 LED Indications of IMG1 in Normal Operation (Multiple IMG Configuration)NAP-200-022Sh

Page 254 - Sheet 4/44

ND-71548 (E) CHAPTER 4Page 309Issue 2SYSTEM STARTUPFigure 022-4 LED Indications of IMG 2/3 in Normal Operation (example) (Multiple IMG Configuration)

Page 255 - Sheet 5/44

CHAPTER 4 ND-71548 (E)Page 310Issue 2SYSTEM STARTUPTest Outline: The System has Alarm Lamps on the TOPU. Figure 023-1 shows the AlarmLamps on the TOPU

Page 256 - Sheet 6/44

ND-71548 (E) CHAPTER 4Page 311Issue 2SYSTEM STARTUPNAP-200-023Sheet 2/2Check of Alarm Lamps of the TOPUSTARTTest of MJ (MAJOR) Lamp Set the circuit br

Page 257 - Sheet 7/44

ND-71548 (E) CHAPTER 2Page 15Issue 2INSTALLATION DESIGN9. SYSTEM ACCOMMODATION9.1 System AccommodationModule Group Configuration and Conditions for Co

Page 258 - Sheet 8/44

CHAPTER 5 ND-71548 (E)Page 312Issue 2INSTALLATION TEST PROCEDURECHAPTER 5 INSTALLATION TEST PROCEDURE1. HOW TO ENTER DATA IN THE TEST CHECK COLUMNEach

Page 259 - CONSOLE

ND-71548 (E) CHAPTER 5Page 313Issue 2INSTALLATION TEST PROCEDUREFigure 5-1 Example of Entry to Test Check Column• This example is NAP-200-023: DT Co

Page 260 - (DESK CONSOLE side)

CHAPTER 5 ND-71548 (E)Page 314Issue 2INSTALLATION TEST PROCEDURE2. BASIC CONNECTION TEST2.1 OutlineAfter the system has been started up, establish som

Page 261 - Handset code

ND-71548 (E) CHAPTER 5Page 315Issue 2INSTALLATION TEST PROCEDURENAP-200-024Sheet 1/1DT (Dial Tone) Connection TestSTARTCheck whether the OPE lamp (G)

Page 262 - Page 244

CHAPTER 5 ND-71548 (E)Page 316Issue 2INSTALLATION TEST PROCEDURENAP-200-025Sheet 1/1Station to Station Connection TestSTARTConfirm that a connection c

Page 263 - Sheet 13/44

ND-71548 (E) CHAPTER 5Page 317Issue 2INSTALLATION TEST PROCEDURE3. SYSTEM INITIALIZED TEST3.1 OutlineTests are to be performed on the restart processi

Page 264 - Page 246

CHAPTER 5 ND-71548 (E)Page 318Issue 2INSTALLATION TEST PROCEDURETest Outline:Tests are performed to see if a changeover of the dual systems (Control S

Page 265 - Page 247

ND-71548 (E) CHAPTER 5Page 319Issue 2INSTALLATION TEST PROCEDUREFigure 026-1 How to Perform a Control System Changeover (Single IMG Configuration)Fig

Page 266 - Sheet 16/44

CHAPTER 5 ND-71548 (E)Page 320Issue 2INSTALLATION TEST PROCEDUREFigure 026-3 LEDs and Switches on TSW/MUXNAP-200-026Sheet 3/8System Changeover Test S

Page 267 - Sheet 17/44

ND-71548 (E) CHAPTER 5Page 321Issue 2INSTALLATION TEST PROCEDURE NAP-200-026Sheet 4/8System Changeover Test Multiple IMG ConfigurationPerform a Spe

Page 268 - Sheet 18/44

CHAPTER 2 ND-71548 (E)Page 16Issue 2INSTALLATION DESIGNNote:A NFILU is mounted in BASEU.Table 2-3 Conditions for ConfigurationUNIT NAME NUMBER OF MODU

Page 269 - 12345678

CHAPTER 5 ND-71548 (E)Page 322Issue 2INSTALLATION TEST PROCEDUREFigure 026-4 LEDs and Switches for System Changeover (Multiple IMG Configuration)NAP-

Page 270 - AC-DC Adapter ( )

ND-71548 (E) CHAPTER 5Page 323Issue 2INSTALLATION TEST PROCEDUREFigure 026-5 System Block Diagram (TSW and MUX) (Single IMG Configuration)NAP-200-026

Page 271 - 1. Cable Connection Diagram

CHAPTER 5 ND-71548 (E)Page 324Issue 2INSTALLATION TEST PROCEDUREFigure 026-6 System Block Diagram (GT and Other Controlling Blocks) (Multiple IMG Con

Page 272 - Sheet 22/44

ND-71548 (E) CHAPTER 5Page 325Issue 2INSTALLATION TEST PROCEDUREFigure 026-7 System Block Diagram (Speech Path) (Multiple IMG Configuration)NAP-200-0

Page 273 - Sheet 23/44

CHAPTER 5 ND-71548 (E)Page 326Issue 2INSTALLATION TEST PROCEDURETest Outline:Tests are performed to see if system initialization can be executed. Ther

Page 274 - Sheet 24/44

ND-71548 (E) CHAPTER 5Page 327Issue 2INSTALLATION TEST PROCEDURENAP-200-027Sheet 2/2System Initialization TestPerform system initialization (by poweri

Page 275 - Page 257

CHAPTER 5 ND-71548 (E)Page 328Issue 2INSTALLATION TEST PROCEDURE NAP-200-028Sheet 1/1Circuit Card Initialization TestSTARTMake the No. 0 CPU the ACT s

Page 276 - Sheet 26/44

ND-71548 (E) CHAPTER 5Page 329Issue 2INSTALLATION TEST PROCEDURE4. PORT CONNECTION TEST4.1 OutlineTests are to be performed on all the circuits of LC

Page 277 - Sheet 27/44

CHAPTER 5 ND-71548 (E)Page 330Issue 2INSTALLATION TEST PROCEDURENAP-200-029Sheet 1/2ORT (RST Card) Connection TestSTARTMake busy all ORTs On the front

Page 278 - Sheet 28/44

ND-71548 (E) CHAPTER 5Page 331Issue 2INSTALLATION TEST PROCEDURENAP-200-029Sheet 2/2ORT (RST Card) Connection TestPerform tests for a situation where

Page 279 - Sheet 29/44

ND-71548 (E) CHAPTER 2Page 17Issue 2INSTALLATION DESIGNFigure 2-4 Time Slot, Group Number AssignmentNote 1: Extended Group No. can be used by FCH (P

Page 280 - Page 262

CHAPTER 5 ND-71548 (E)Page 332Issue 2INSTALLATION TEST PROCEDURENAP-200-030Sheet 1/1ATTCON (ATI Card) Connection TestSTARTA station repeats an ATTCON

Page 281 - Sheet 31/44

ND-71548 (E) CHAPTER 5Page 333Issue 2INSTALLATION TEST PROCEDURENAP-200-031Sheet 1/1Line (LC, ELC, DLC, Card) Connection TestAn ATTCON or Dterm is cal

Page 282 - Sheet 32/44

CHAPTER 5 ND-71548 (E)Page 334Issue 2INSTALLATION TEST PROCEDURETest Outline:The purpose of this test is to confirm, by setting up an outgoing connect

Page 283 - Sheet 33/44

ND-71548 (E) CHAPTER 5Page 335Issue 2INSTALLATION TEST PROCEDURE• Set up a loop-back connection between the COT (C.O. Trunk) to be tested and a statio

Page 284 - Sheet 34/44

CHAPTER 5 ND-71548 (E)Page 336Issue 2INSTALLATION TEST PROCEDURE• If the TLT is a 4W E&M System, connect the related leads as shown below:• Set up

Page 285 - Sheet 35/44

ND-71548 (E) CHAPTER 5Page 337Issue 2INSTALLATION TEST PROCEDURETest Outline:The purpose of this test is to confirm, by setting up an incoming trunk c

Page 286 - Sheet 36/44

CHAPTER 5 ND-71548 (E)Page 338Issue 2INSTALLATION TEST PROCEDURENAP-200-033Sheet 2/2Incoming Trunk (COT, TLT, DTI Card)Connection TestFor a Dial-In Si

Page 287 - Sheet 37/44

ND-71548 (E) CHAPTER 5Page 339Issue 2INSTALLATION TEST PROCEDURENAP-200-034Sheet 1/1Direct-In Termination Trunk (COT Card)Connection TestSTARTOn the M

Page 288 - Sheet 38/44

CHAPTER 5 ND-71548 (E)Page 340Issue 2INSTALLATION TEST PROCEDURENAP-200-035Sheet 1/1SND (RST Card) Connection TestSTARTWhen a C.O. Line or Tie Line is

Page 289 - Sheet 39/44

ND-71548 (E) CHAPTER 5Page 341Issue 2INSTALLATION TEST PROCEDURENAP-200-036Sheet 1/13-party Conference Trunk Function TestSTARTMade busy all CFTs Made

Page 290 - Sheet 40/44

CHAPTER 2 ND-71548 (E)Page 18Issue 2INSTALLATION DESIGNFigure 2-5 Face Layout (Single IMG Configuration) 01 03 04 05 06 07 08PWR #0 (PX-PW01)PWR #1

Page 291 - Sheet 41/44

CHAPTER 5 ND-71548 (E)Page 342Issue 2INSTALLATION TEST PROCEDURENAP-200-037Sheet 1/1Connection Test-Announcement Trunk for Announcement ServiceSTARTDi

Page 292 - Sheet 42/44

ND-71548 (E) CHAPTER 5Page 343Issue 2INSTALLATION TEST PROCEDURENAP-200-038Sheet 1/1Connection Test-Digital Announcement Trunk for Announcement Servic

Page 293 - Sheet 43/44

CHAPTER 5 ND-71548 (E)Page 344Issue 2INSTALLATION TEST PROCEDURENAP-200-039Sheet 1/1Connection Test-Paging Trunk for Paging Access ServiceSTARTDial th

Page 294 - Sheet 44/44

ND-71548 (E) CHAPTER 5Page 345Issue 2INSTALLATION TEST PROCEDURE• Paging Transfer Service can be selected according to System Data (SYS1, INDEX 73).1.

Page 295 - Page 277

CHAPTER 5 ND-71548 (E)Page 346Issue 2INSTALLATION TEST PROCEDURENAP-200-040Sheet 2/2Connection Test-Paging Trunk for Paging Transfer ServiceConnection

Page 296 - Connections

ND-71548 (E) CHAPTER 5Page 347Issue 2INSTALLATION TEST PROCEDURENAP-200-041Sheet 1/1Radio Paging Trunk (COT Card) Connection TestSTARTCall the Radio P

Page 297 - (port#2 / port#3)

CHAPTER 5 ND-71548 (E)Page 348Issue 2INSTALLATION TEST PROCEDURETest Outline:The Howler Tone Generator and the Ringing Generator are equipped on the P

Page 298 - Sheet 4/10

ND-71548 (E) CHAPTER 5Page 349Issue 2INSTALLATION TEST PROCEDURE NAP-200-042Sheet 2/2Howler & Ringing Signal TestCheck PWR1 in each PIM.While b

Page 299 - Sheet 5/10

CHAPTER 5 ND-71548 (E)Page 350Issue 2INSTALLATION TEST PROCEDURE5. OVERALL TEST5.1 OutlineTests are to be performed to check C.O. Lines and/or Tie Lin

Page 300

ND-71548 (E) CHAPTER 5Page 351Issue 2INSTALLATION TEST PROCEDURENAP-200-043Sheet 1/1Overall Test for C.O. Line Outgoing CallSTARTSeizure of trunk to b

Page 301 - IPX 2PORT CA-A

ND-71548 (E) CHAPTER 2Page 19Issue 2INSTALLATION DESIGNFigure 2-6 Face Layout of Multiple IMG System (IMG0) 01 03 04 05 06 07 08PWR #0 (PX-PW01)PWR

Page 302 - Page 284

CHAPTER 5 ND-71548 (E)Page 352Issue 2INSTALLATION TEST PROCEDURETest Outline:The tests comprising this NAP are to be performed according to the C.O. L

Page 303 - Page 285

ND-71548 (E) CHAPTER 5Page 353Issue 2INSTALLATION TEST PROCEDURENAP-200-045Sheet 1/2Overall Test of CCIS Tie Line Outgoing CallSTARTSeizure of trunk t

Page 304 - Page 286

CHAPTER 5 ND-71548 (E)Page 354Issue 2INSTALLATION TEST PROCEDURE(Procedure A)NAP-200-045Sheet 2/2Overall Test of CCIS Tie Line Outgoing CallSTARTOn th

Page 305 - Connections of SMDR

ND-71548 (E) CHAPTER 5Page 355Issue 2INSTALLATION TEST PROCEDURENAP-200-046Sheet 1/1Overall Test of CCIS Tie Line Incoming CallSTARTSeizure of trunk t

Page 306 - Sheet 2/4

CHAPTER 5 ND-71548 (E)Page 356Issue 2INSTALLATION TEST PROCEDURENAP-200-047Sheet 1/2Test of Connection and Alternate Routing to All Tie LinesSTARTTest

Page 307

ND-71548 (E) CHAPTER 5Page 357Issue 2INSTALLATION TEST PROCEDUREFigure 047-1 Combination of Tie Line Network and Public NetworkFigure 047-2 Tie Line

Page 308 - Sheet 4/4

CHAPTER 5 ND-71548 (E)Page 358Issue 2INSTALLATION TEST PROCEDUREFigure 048-1 Test of Tandem Connection to Tie LineNAP-200-048Sheet 1/2Test of Tandem

Page 309 - CHAPTER 4 SYSTEM STARTUP

ND-71548 (E) CHAPTER 5Page 359Issue 2INSTALLATION TEST PROCEDURENAP-200-048Sheet 2/2Test of Tandem Connection to Tie LineTest of tandem connection via

Page 310 - SYSTEM STARTUP

CHAPTER 5 ND-71548 (E)Page 360Issue 2INSTALLATION TEST PROCEDUREFor the PBX, PADs can be set according to the connecting status of the Tie Line involv

Page 311

ND-71548 (E) CHAPTER 5Page 361Issue 2INSTALLATION TEST PROCEDUREWhen setting up a No. 7 CCIS Network, PAD setting differs from that in the analog netw

Page 312 - Circuit

CHAPTER 2 ND-71548 (E)Page 20Issue 2INSTALLATION DESIGNFigure 2-7 Face Layout of Multiple IMG System (IMG1) 00 01 02 03 04 05 06 07 08 09 10 11 12 1

Page 313 - Power ON

CHAPTER 5 ND-71548 (E)Page 362Issue 2INSTALLATION TEST PROCEDURE6. IP CONNECTION TEST6.1 OutlineConnection tests are to be performed to check IP conne

Page 314 - Sheet 2/2

ND-71548 (E) CHAPTER 5Page 363Issue 2INSTALLATION TEST PROCEDUREThe following describes the procedure for confirming the normality of IP PAD. Here des

Page 315 - Program Install and Load

CHAPTER 5 ND-71548 (E)Page 364Issue 2INSTALLATION TEST PROCEDURE NAP-200-050Sheet 2/3IP PAD Connection TestATTENTIONContentsStatic SensitiveHandlin

Page 316 - Sheet 2/7

ND-71548 (E) CHAPTER 5Page 365Issue 2INSTALLATION TEST PROCEDURE NAP-200-050Sheet 3/3IP PAD Connection TestATTENTIONContentsStatic SensitiveHandlin

Page 317 - Sheet 3/7

CHAPTER 5 ND-71548 (E)Page 366Issue 2INSTALLATION TEST PROCEDUREThe following describes the procedure for confirming the normality of IPTRK in the cas

Page 318 - Sheet 4/7

ND-71548 (E) CHAPTER 5Page 367Issue 2INSTALLATION TEST PROCEDURE NAP-200-051Sheet 2/3IPTRK (IP Trunk Card for FCCS) Connection TestATTENTIONContents

Page 319 - Sheet 5/7

CHAPTER 5 ND-71548 (E)Page 368Issue 2INSTALLATION TEST PROCEDURE NAP-200-051Sheet 3/3IPTRK (IP Trunk Card for FCCS) Connection TestATTENTIONContents

Page 320 - LOAD lights red

ND-71548 (E) CHAPTER 5Page 369Issue 2INSTALLATION TEST PROCEDUREThe following describes the procedure for confirming the normality of IPTRK in the cas

Page 321 - Assignment of Office Data

CHAPTER 5 ND-71548 (E)Page 370Issue 2INSTALLATION TEST PROCEDURE NAP-200-052Sheet 2/3IPTRK (IP Trunk Card for CCIS) Connection TestATTENTIONContent

Page 322

ND-71548 (E) CHAPTER 5Page 371Issue 2INSTALLATION TEST PROCEDURE NAP-200-052Sheet 3/3IPTRK (IP Trunk Card for CCIS) Connection TestATTENTIONConten

Page 323 - Messages

ND-71548 (E) CHAPTER 2Page 21Issue 2INSTALLATION DESIGNFigure 2-8 Face Layout of Multiple IMG System (IMG2/3)00 01 02 03 04 05 06 07 08 09 10 11 12

Page 324 - Sheet 2/5

CHAPTER 5 ND-71548 (E)Page 372Issue 2INSTALLATION TEST PROCEDUREThe following describes the procedure for confirming the normality of IPTRK in the cas

Page 325 - Sheet 3/5

ND-71548 (E) CHAPTER 5Page 373Issue 2INSTALLATION TEST PROCEDURE NAP-200-053Sheet 2/3IPTRK (IP Trunk Card for H.323) Connection TestATTENTIONConte

Page 326 - Sheet 4/5

CHAPTER 5 ND-71548 (E)Page 374Issue 2INSTALLATION TEST PROCEDURE NAP-200-053Sheet 3/3IPTRK (IP Trunk Card for H.323) Connection TestATTENTIONConte

Page 327 - Sheet 5/5

ND-71548 (E) CHAPTER 5Page 375Issue 2INSTALLATION TEST PROCEDUREThe following describes the procedure for confirming the normality of PHA. Here descri

Page 328

CHAPTER 5 ND-71548 (E)Page 376Issue 2INSTALLATION TEST PROCEDURE NAP-200-054Sheet 2/2PHA Connection TestATTENTIONContentsStatic SensitiveHandlingPrec

Page 329 - NAP-200-023

ND-71548 (E) CHAPTER 5Page 377Issue 2INSTALLATION TEST PROCEDUREThe following describes the procedure for confirming the normality of PHD. Here descri

Page 330 - INSTALLATION TEST PROCEDURE

CHAPTER 5 ND-71548 (E)Page 378Issue 2INSTALLATION TEST PROCEDURE NAP-200-055Sheet 2/3PHD Connection TestATTENTIONContentsStatic SensitiveHandlingPrec

Page 331 - Page 313

ND-71548 (E) CHAPTER 5Page 379Issue 2INSTALLATION TEST PROCEDURE NAP-200-055Sheet 3/3PHD Connection TestATTENTIONContentsStatic SensitiveHandlingPrec

Page 332

CHAPTER 5 ND-71548 (E)Page 380Issue 2INSTALLATION TEST PROCEDUREThe following describes the procedure for confirming the normality of PHC. Here descri

Page 333 - Page 315

ND-71548 (E) CHAPTER 5Page 381Issue 2INSTALLATION TEST PROCEDURE NAP-200-056Sheet 2/3PHC Connection TestATTENTIONContentsStatic SensitiveHandlingPre

Page 334 - Page 316

PRODUCT LIABILITY ND-71548 (E)PL- 2Issue 2PRODUCT LIABILITY2. NOTICE WHEN USED2.1 Consideration of PBX, Power-related Equipment and Peripheral Equipm

Page 335

CHAPTER 2 ND-71548 (E)Page 22Issue 2INSTALLATION DESIGN9.2 Circuit Card LocationsThis section explains the main function of controlling circuit cards

Page 336 - Sheet 1/8

CHAPTER 5 ND-71548 (E)Page 382Issue 2INSTALLATION TEST PROCEDURE NAP-200-056Sheet 3/3PHC Connection TestATTENTIONContentsStatic SensitiveHandlingPr

Page 337 - Sheet 2/8

ND-71548 (E) CHAPTER 6Page 383Issue 2FAULT RECOVERY DURING TESTSCHAPTER 6 FAULT RECOVERY DURING TESTS1. GENERALThe fault recovery procedures in this C

Page 338 - TSW (PH-SW10) MUX (PH-PC36)

CHAPTER 6 ND-71548 (E)Page 384Issue 2FAULT RECOVERY DURING TESTSNAP-200-057Sheet 1/2Abnormal Lamp Indications After System StartupSTARTPerform the fol

Page 339 - Sheet 4/8

ND-71548 (E) CHAPTER 6Page 385Issue 2FAULT RECOVERY DURING TESTSNAP-200-057Sheet 2/2Abnormal Lamp Indications After System StartupPerform the followin

Page 340 - Sheet 5/8

CHAPTER 6 ND-71548 (E)Page 386Issue 2FAULT RECOVERY DURING TESTSNAP-200-058Sheet 1/1DT (Dial Tone) Connection FaultSTARTDial tone is not heard.On the

Page 341 - Page 323

ND-71548 (E) CHAPTER 6Page 387Issue 2FAULT RECOVERY DURING TESTSNAP-200-059Sheet 1/2Station to Station Connection FaultSTARTDial Tone (DT) is still he

Page 342

CHAPTER 6 ND-71548 (E)Page 388Issue 2FAULT RECOVERY DURING TESTSNAP-200-059Sheet 2/2Station to Station Connection FaultAfter the call has been answere

Page 343 - Sheet 8/8

ND-71548 (E) CHAPTER 7Page 389Issue 2WORK AFTER INSTALLATION TESTSCHAPTER 7 WORK AFTER INSTALLATION TESTSThis Chapter explains various kinds of work a

Page 344 - Page 326

CHAPTER 7 ND-71548 (E)Page 390Issue 2WORK AFTER INSTALLATION TESTS2. PREPARATION OF TEST RESULT REPORTWhen submitting a report of test results to the

Page 345 - System Initialization Test

ND-71548 (E) CHAPTER 7Page 391Issue 2WORK AFTER INSTALLATION TESTSFigure 7-1 Mounting of the Covers07/31/02

Page 346 - NAP-200-028

ND-71548 (E) CHAPTER 2Page 23Issue 2INSTALLATION DESIGNFigure 2-10 Controlling Circuit Cards in PIM 0 (Single IMG Configuration Only)Table 2-5 Contr

Page 347

CHAPTER 7 ND-71548 (E)Page 392Issue 2WORK AFTER INSTALLATION TESTSFigure 7-2 Side Cover Mounting Method (BASEU+LPR+PIM0)SCREWFRONTREARSIDE COVER07/3

Page 348 - Page 330

ND-71548 (E) CHAPTER 7Page 393Issue 2WORK AFTER INSTALLATION TESTSFigure 7-3 Side Cover Mounting Method (PIM)REARSIDE COVER

Page 349 - NAP-200-029

CHAPTER 7 ND-71548 (E)Page 394Issue 2WORK AFTER INSTALLATION TESTSFigure 7-4 Rear Cover Mounting Method (BASEU+LPR+PIM0)SCREWSCREWSCREWSCREWSCREWSCR

Page 350 - Page 332

ND-71548 (E) CHAPTER 7Page 395Issue 2WORK AFTER INSTALLATION TESTSFigure 7-5 Rear Cover Mounting Method (PIM)MODULEREAR SIDEREAR COVERSCREWSCREWMODU

Page 351 - Page 333

CHAPTER 7 ND-71548 (E)Page 396Issue 2WORK AFTER INSTALLATION TESTSFigure 7-6 Rear Cover Mounting Method (FANU)FANUREAR COVERSCREWSCREWFANUREAR COVER

Page 352 - Connection Test

ND-71548 (E) CHAPTER 7Page 397Issue 2WORK AFTER INSTALLATION TESTSFigure 7-7 Front Cover Mounting Method (BASEU+LPR+PIM0)FRONT COVER

Page 353 - Sheet 2/3

CHAPTER 7 ND-71548 (E)Page 398Issue 2WORK AFTER INSTALLATION TESTSFigure 7-8 Front Cover Mounting Method (PIM)Mount the Front Cover onto the module

Page 354 - Page 336

ND-71548 (E) CHAPTER 7Page 399Issue 2WORK AFTER INSTALLATION TESTSFigure 7-9 Front Cover Mounted Method (FANU)FANUFRONT COVER C(U)

Page 355 - NAP-200-033

CHAPTER 7 ND-71548 (E)Page 400Issue 2WORK AFTER INSTALLATION TESTS4. ATTACHMENT OF INTER-FRAME BRACKETSThis section covers how to attach inter-frame b

Page 356

ND-71548 (E) CHAPTER 7Page 401Issue 2WORK AFTER INSTALLATION TESTS<Attachment Procedure>STEP 1: Referring to the Figure 7-11 through Figure 7-11

Page 357 - Page 339

CHAPTER 2 ND-71548 (E)Page 24Issue 2INSTALLATION DESIGNFigure 2-11 Controlling Circuit Cards in PIMTable 2-6 Controlling Circuit Cards in PIMSlot No

Page 358 - Page 340

CHAPTER 7 ND-71548 (E)Page 402Issue 2WORK AFTER INSTALLATION TESTSFigure 7-11 How to Attach Inter-frame Brackets (Continued)SL-C.P.B.M.S x 4 x 8 x 3

Page 359 - Page 341

ND-71548 (E) CHAPTER 7Page 403Issue 2WORK AFTER INSTALLATION TESTSFigure 7-11 How to Attach Inter-frame Brackets (Continued)STEP 4: Referring to Fig

Page 360 - Page 342

CHAPTER 7 ND-71548 (E)Page 404Issue 2WORK AFTER INSTALLATION TESTS5. SITE CLEANINGUpon completion of the works described in Section 1 to 4 of this Cha

Page 361 - Page 343

ISSUE 1 ISSUE 2 ISSUE 3 ISSUE 4DATE MAY, 2002 DATE AUGUST, 2002 DATE DATEISSUE 5 ISSUE 6 ISSUE 7 ISSUE 8DATE DATE DATE DATENEAX2400 IPX Internet Proto

Page 362 - Page 344

ISSUE 1 ISSUE 2 ISSUE 3 ISSUE 4DATE MAY, 2002 DATE AUGUST, 2002 DATE DATEISSUE 5 ISSUE 6 ISSUE 7 ISSUE 8DATE DATE DATE DATENEAX2400 IPX Internet Proto

Page 363 - Page 345

ISSUE 1 ISSUE 2 ISSUE 3 ISSUE 4DATE MAY, 2002 DATE AUGUST, 2002 DATE DATEISSUE 5 ISSUE 6 ISSUE 7 ISSUE 8DATE DATE DATE DATENEAX2400 IPX Internet Proto

Page 364 - Transfer Service

ISSUE 1 ISSUE 2 ISSUE 3 ISSUE 4DATE MAY, 2002 DATE AUGUST, 2002 DATE DATEISSUE 5 ISSUE 6 ISSUE 7 ISSUE 8DATE DATE DATE DATENEAX2400 IPX Internet Proto

Page 365 - Page 347

ISSUE 1 ISSUE 2 ISSUE 3 ISSUE 4DATE MAY, 2002 DATE AUGUST, 2002 DATE DATEISSUE 5 ISSUE 6 ISSUE 7 ISSUE 8DATE DATE DATE DATENEAX2400 IPX Internet Proto

Page 366 - Page 348

ISSUE 1 ISSUE 2 ISSUE 3 ISSUE 4DATE MAY, 2002 DATE AUGUST, 2002 DATE DATEISSUE 5 ISSUE 6 ISSUE 7 ISSUE 8DATE DATE DATE DATENEAX2400 IPX Internet Proto

Page 367 - NAP-200-042

ND-71548 (E) CHAPTER 2Page 25Issue 2INSTALLATION DESIGNFigure 2-12 Controlling Circuit Cards in TSWM (Multiple IMG Configuration)Table 2-7 Controlli

Page 368

CHAPTER 2 ND-71548 (E)Page 26Issue 2INSTALLATION DESIGN9.3 Preparation of Trunking DiagramPrepare the trunking diagram for the customer’s specificatio

Page 369 - Page 351

ND-71548 (E) CHAPTER 2Page 27Issue 2INSTALLATION DESIGN10.1 AC Input, DC Power, And Ground Cables1. For AC input cable, VCT (Polyvinyl Chloride Cabtyr

Page 370 - Page 352

CHAPTER 2 ND-71548 (E)Page 28Issue 2INSTALLATION DESIGNFigure 2-14 DC Main Power Cable and Main Ground Cable (3- or 4-PIM System) (Single IMG Config

Page 371 - Page 353

ND-71548 (E) CHAPTER 2Page 29Issue 2INSTALLATION DESIGNFigure 2-15 DC Main Power Cable and Main Ground Cable (Multiple IMG Configuration)BATTERYAC P

Page 372 - Page 354

CHAPTER 2 ND-71548 (E)Page 30Issue 2INSTALLATION DESIGNTable 2-8 Clamp Terminal Shape and PurposeTYPE SHAPE PURPOSE REMARKSAEnd terminalTBranch or ext

Page 373 - Page 355

ND-71548 (E) CHAPTER 2Page 31Issue 2INSTALLATION DESIGNNote:Selection of T-Type Clamp TerminalThe asterisk (*) in Table 2-9 indicates that an auxiliar

Page 374 - NAP-200-047

ND-71548 (E) PRODUCT LIABILITY PL- 3Issue 2PRODUCT LIABILITYDANGERDo not damage, remake, forcefully bend, forcefully extract, nor forcefully twist an

Page 375

CHAPTER 2 ND-71548 (E)Page 32Issue 2INSTALLATION DESIGNFigure 2-16 Calculation Method for Sectional AreaTable 2-10 Clamping Tool*TOOL TYPEAPPLICABLE

Page 376 - Page 358

ND-71548 (E) CHAPTER 2Page 33Issue 2INSTALLATION DESIGN10.2 Cables Between The PBX And MDFRegarding lines, trunks, and NCU (PFT), 25P shielded the PBX

Page 377 - NAP-200-048

CHAPTER 2 ND-71548 (E)Page 34Issue 2INSTALLATION DESIGNFigure 2-17 Outline of Cables from Module Group to the OutsideCONNECTORDESIGNATIONLEADDESIGNA

Page 378 - Page 360

ND-71548 (E) CHAPTER 3Page 35Issue 2INSTALLATION PROCEDURECHAPTER 3 INSTALLATION PROCEDURE1. GENERALThis chapter explains the procedures for installin

Page 379 - Page 361

CHAPTER 3 ND-71548 (E)Page 36Issue 2INSTALLATION PROCEDURE2. PRECAUTIONS BEFORE BEGINNING INSTALLATION2.1 Outline1. Before beginning the installation,

Page 380

ND-71548 (E) CHAPTER 3Page 37Issue 2INSTALLATION PROCEDURE4. As the cable to be run between the PBX and the Rectifier, use a CV cable (600 V Crosslink

Page 381 - IP PAD Connection Test

CHAPTER 3 ND-71548 (E)Page 38Issue 2INSTALLATION PROCEDURE3. INSTALLATION PROCEDUREThe flowchart in Figure 3-2 shows the installation procedure. Each

Page 382

ND-71548 (E) CHAPTER 3Page 39Issue 2INSTALLATION PROCEDUREThis NAP explains the following work items:• Confirmation of Equipment Locations• Confirmati

Page 383

CHAPTER 3 ND-71548 (E)Page 40Issue 2INSTALLATION PROCEDURENAP-200-001Sheet 2/2Installation PreparationProper Locations: • A dry and clean place. • A p

Page 384 - NAP-200-051

ND-71548 (E) CHAPTER 3Page 41Issue 2INSTALLATION PROCEDUREThis NAP explains the procedures for marking, drilling and other necessary work when the PBX

Page 385

PRODUCT LIABILITY ND-71548 (E)PL- 4Issue 2PRODUCT LIABILITYWARNINGFix the equipment. Do not put any object on PBX and Main Power; it might be danger-o

Page 386

CHAPTER 3 ND-71548 (E)Page 42Issue 2INSTALLATION PROCEDURE1. WHEN SECURING THE PBX DIRECTLY ONTO THE FLOOR NAP-200-002Sheet 2/8Marking, Leveling, and

Page 387 - NAP-200-052

ND-71548 (E) CHAPTER 3Page 43Issue 2INSTALLATION PROCEDUREFigure 002-1 Locations of Base Unit Securing HolesNAP-200-002Sheet 3/8Marking, Leveling, an

Page 388

CHAPTER 3 ND-71548 (E)Page 44Issue 2INSTALLATION PROCEDUREFigure 002-2 Cable Hole on a Free-Access or Computer FloorNAP-200-002Sheet 4/8Marking, Leve

Page 389

ND-71548 (E) CHAPTER 3Page 45Issue 2INSTALLATION PROCEDURE2. WHEN SECURING THE PBX WITH THE SPECIAL STANDNAP-200-002Sheet 5/8Marking, Leveling, and Dr

Page 390 - NAP-200-053

CHAPTER 3 ND-71548 (E)Page 46Issue 2INSTALLATION PROCEDUREFigure 002-3 Example of Special StandFigure 002-4 Special Stand Installation MethodNAP-200

Page 391

ND-71548 (E) CHAPTER 3Page 47Issue 2INSTALLATION PROCEDURE3. WHEN SECURING PBX WITH FLOOR ELEVATIONSFigure 002-5 Example of ElevationNAP-200-002Sheet

Page 392

CHAPTER 3 ND-71548 (E)Page 48Issue 2INSTALLATION PROCEDURE4. MARKING, LEVELING AND DRILLING FOR MDF, POWER EQUIPMENT, AND PERIPHERAL EQUIPMENTNAP-200-

Page 393 - PHA Connection Test

ND-71548 (E) CHAPTER 3Page 49Issue 2INSTALLATION PROCEDUREThis NAP explains the procedure for unpacking and inspection.Note 1: If any equipment is mis

Page 394

CHAPTER 3 ND-71548 (E)Page 50Issue 2INSTALLATION PROCEDURE2. INSPECTIONNAP-200-003Sheet 2/2Unpacking and InspectionSTARTVisually Inspect Modules and U

Page 395 - PHD Connection Test

ND-71548 (E) CHAPTER 3Page 51Issue 2INSTALLATION PROCEDUREThis NAP explains the procedure for securing the Base Unit onto the floor directly or using

Page 396

ND-71548 (E) PRODUCT LIABILITY PL- 5Issue 2PRODUCT LIABILITYWARNINGBe careful of using a battery as following:Rechargeable lead battery is used as the

Page 397

CHAPTER 3 ND-71548 (E)Page 52Issue 2INSTALLATION PROCEDUREFigure 004-2 Mounting the Base Unit on a Free-Access or Computer FloorFigure 004-3 Mountin

Page 398 - PHC Connection Test

ND-71548 (E) CHAPTER 3Page 53Issue 2INSTALLATION PROCEDURE2. INSTALLING THE BASE UNIT USING A SPECIAL STANDFigure 004-4 Setting the BASEU via Special

Page 399

CHAPTER 3 ND-71548 (E)Page 54Issue 2INSTALLATION PROCEDURE1. MOUNTING OF UNITS AND MODULESFigure 005-1 Procedure for Mounting Units and ModulesNAP-20

Page 400

ND-71548 (E) CHAPTER 3Page 55Issue 2INSTALLATION PROCEDURE2. INSTALLATION OF FANULocation of FANU (PZ-M369 and three electronic FANs) is shown in Figu

Page 401 - FAULT RECOVERY DURING TESTS

CHAPTER 3 ND-71548 (E)Page 56Issue 2INSTALLATION PROCEDURE3. PROCEDURE FOR FANU ON THE TOPUWhen any IMG is configured by two PIMs or less, the FANU is

Page 402 - NAP-200-057

ND-71548 (E) CHAPTER 3Page 57Issue 2INSTALLATION PROCEDURESTEP 4: Fix a FAN fuse (5.0A) onto the PZ-M369.Figure 005-4 Attachment of FAN Fuse (PZ-M369

Page 403

CHAPTER 3 ND-71548 (E)Page 58Issue 2INSTALLATION PROCEDUREFigure 005-5 Cable Connections for FANU on TOPUNAP-200-005Sheet 5/18Mounting of Units and M

Page 404 - NAP-200-058

ND-71548 (E) CHAPTER 3Page 59Issue 2INSTALLATION PROCEDUREFigure 005-6 Connection of “FAN” Connector Cable (TOPU-PIM)NAP-200-005Sheet 6/18Mounting of

Page 405 - NAP-200-059

CHAPTER 3 ND-71548 (E)Page 60Issue 2INSTALLATION PROCEDUREFigure 005-7 Attachment of the Top CoverNAP-200-005Sheet 7/18Mounting of Units and ModulesN

Page 406

ND-71548 (E) CHAPTER 3Page 61Issue 2INSTALLATION PROCEDURE4. PROCEDURE FOR FANU IN THE FAN BOXWhen any IMG is configured by 3 or 4 PIMs, the FANU must

Page 407 - WORK AFTER INSTALLATION TESTS

PRODUCT LIABILITY ND-71548 (E)PL- 6Issue 2PRODUCT LIABILITYATTENTIONDo not use benzine, thinner, and alcohol for cleaning. When it is difficult to cle

Page 408 - Page 390

CHAPTER 3 ND-71548 (E)Page 62Issue 2INSTALLATION PROCEDUREFigure 005-8 Relocation of FANU and Insertion into FAN BOXNAP-200-005Sheet 9/18Mounting of

Page 409

ND-71548 (E) CHAPTER 3Page 63Issue 2INSTALLATION PROCEDUREFigure 005-9 FAN Cable Connections for FC0/FC1/FC2 ConnectorsNAP-200-005Sheet 10/18Mounting

Page 410 - SIDE COVER

CHAPTER 3 ND-71548 (E)Page 64Issue 2INSTALLATION PROCEDURESTEP 5: Fix a FAN fuse (5.0A) onto the PZ-M369 by referring to Figure 005-4.STEP 6: Connect

Page 411

ND-71548 (E) CHAPTER 3Page 65Issue 2INSTALLATION PROCEDUREFigure 005-10 Cable Connections for FANU in FAN BOXNAP-200-005Sheet 12/18Mounting of Units

Page 412 - Page 394

CHAPTER 3 ND-71548 (E)Page 66Issue 2INSTALLATION PROCEDUREFigure 005-11 Connection of “FAN” Connector Cable (FAN BOX-PIM)NAP-200-005Sheet 13/18Mounti

Page 413 - Page 395

ND-71548 (E) CHAPTER 3Page 67Issue 2INSTALLATION PROCEDURE5. ATTACHING THE ADDITIONAL NOISE FILTER UNIT (NFILU) TO THE BASEUThe following flowchart sh

Page 414 - Page 396

CHAPTER 3 ND-71548 (E)Page 68Issue 2INSTALLATION PROCEDUREFigure 005-12 Insertion of NFILUFigure 005-13 Attaching of NFILUNAP-200-005Sheet 15/18Moun

Page 415 - Page 397

ND-71548 (E) CHAPTER 3Page 69Issue 2INSTALLATION PROCEDUREFigure 005-14 Cabling Diagram of NFILUNAP-200-005Sheet 16/18Mounting of Units and Modules(-

Page 416 - FRONT COVER

CHAPTER 3 ND-71548 (E)Page 70Issue 2INSTALLATION PROCEDURE This NAP explains the procedures for installing the power equipment.Note: The Circuit Break

Page 417 - FRONT COVER C(U)

ND-71548 (E) CHAPTER 3Page 71Issue 2INSTALLATION PROCEDURE This NAP explains the procedures for installing the MDF.NAP-200-007Sheet 1/1Installation o

Page 418 - Page 400

ND-71548 (E) PRODUCT LIABILITY PL- 7Issue 2PRODUCT LIABILITY2.2 Installation EnvironmentThese items describe the consideration before the installation

Page 419 - <Attachment Procedure>

CHAPTER 3 ND-71548 (E)Page 72Issue 2INSTALLATION PROCEDURE This NAP explains the following work items.• Connection of Power and Ground Cables• Connect

Page 420 - Page 402

ND-71548 (E) CHAPTER 3Page 73Issue 2INSTALLATION PROCEDURE Figure 008-1 Detail of Cable Running (Single IMG Configuration)NAP-200-008Sheet 2/13Connec

Page 421 - Page 403

CHAPTER 3 ND-71548 (E)Page 74Issue 2INSTALLATION PROCEDURE Figure 008-2 Detail of Cable Running (Multiple IMG Configuration)NAP-200-008Sheet 3/13Co

Page 422 - Page 404

ND-71548 (E) CHAPTER 3Page 75Issue 2INSTALLATION PROCEDURE Figure 008-3 Connection of Power and Ground Cables to Power Receiving TerminalNAP-200-008

Page 423

CHAPTER 3 ND-71548 (E)Page 76Issue 2INSTALLATION PROCEDURE2. CONNECTION OF DC-DC CONVERTER FOR TELEPHONE SETS EQUIPPED WITH MESSAGE WAITINGLAMPSNAP-20

Page 424

ND-71548 (E) CHAPTER 3Page 77Issue 2INSTALLATION PROCEDUREFigure 008-4 Example Connection Diagram-DC-DC Converter for Message Waiting LampsNAP-200-00

Page 425

CHAPTER 3 ND-71548 (E)Page 78Issue 2INSTALLATION PROCEDUREFigure 008-5 Removal of Shorting Piece and Cable ConnectionNAP-200-008Sheet 7/13Connection

Page 426

ND-71548 (E) CHAPTER 3Page 79Issue 2INSTALLATION PROCEDURE3. END JOINTING OF POWER AND GROUND CABLESNAP-200-008Sheet 8/13Connection of Power and Groun

Page 427

CHAPTER 3 ND-71548 (E)Page 80Issue 2INSTALLATION PROCEDUREFigure 008-6 Placing the Clamp Terminal on the DieFigure 008-7 Clamping MethodNAP-200-008S

Page 428

ND-71548 (E) CHAPTER 3Page 81Issue 2INSTALLATION PROCEDURE4. BRANCHING OF POWER CABLESNAP-200-008Sheet 10/13Connection of Power and Ground Cables from

Commentaires sur ces manuels

Pas de commentaire